First Stage:
Drip Tray catches all sprayer debris and drained fitting to connect to plant drains.
Second Stage:
175 Gallon SS insulated tank.
SS Steam heating manifold.
(Optional) 40 KW 600 volt electrically heated tank
Temperature controller turns on and off steam valve.
Temperature gauge.
Low water pump cut out.
Automatic refill float valve.
Large drain valve and sloped for fast and easy washout.
Large rectangular filter basked to catch foreign material before being repumped to nozzles.
(Optional) P.H. controller, sensor, and chemical pump to control and maintain chemical strength in the tank.)
Third Stage:
125 Gallon SS Tank
Large drain valve and sloped for fast and easy washout.
Automatic refill float valve.
Low water pump cut out.
Large rectangular basket filter to catch foreign material before being pumped through nozzles.
Fourth Stage:
The drip tank catches all and drains to plant.
(Optional) Sanitizer recycle is available, although mostly not recommended, only for iodine-based disinfectant.
(Optional ORP controller, sensor, and chemical pump) To control and ensure sanitize strength.